Wood is a natural perfect product, very flexible and highly resistant in mechanical terms compared to its weight. As a natural raw material wood is renewable, durable, versatile and can be cost-effective. And, in the end, it is a perfectly and naturally beautiful material.

There are several benefits that justify our choice of working with wood instead of other traditional materials and make it one of the most economic materials relative to its rapid implementation.

• Easy to extract and transform;

• Completely reduces the amount of waste, using it to manufacture new components;

• Natural and renewable product;

• Fully recyclable;

• High longevity;

• Light material;

• Easy to transport;

• Allow the construction of large spans;

• Structurally very strong and solid;

• Easy and versatile connections to establish;

• Fast and efficient to build with;

• Thermal comfort, acoustic and visual;

• Natural insulator and regulates the climate inside home;

• Natural and exclusive beauty with high architectural value and sense of comfort.

Therefore, MIMA houses are considered to be completely friendly with ecological footprint, sustainable and economic due to its full programmed costs.


Depending on the house size and typology, the construction period of a MIMA ReStart in factory varies between 8 and 12 weeks. The average time for assembly on site is 8 to 15 days. After final assembly is necessary one week for final arrangements.


MIMA ensures a 5 year guarantee period after completion, in case of construction issues. In addition, MIMA ReStart is delivered with a folder which contains all fact sheets and guarantees for each component; these can be activated in case of issues. Most of materials we have chosen for MIMA ReStart have a guarantee period over 40 years.


MIMA floor, walls and ceiling are cladded with high density plaster and resins applied on tensile mesh, a resistant composite which includes a thick layer of insulation - suitable both for warm and cold climates. For sites with extreme climate conditions, we often reevaluate the project with our team of engineers and apply thicker versions of exterior walls. Also when it comes to extremely warm areas, we normally recommend our costumers to apply thicker glazing with stronger UV values.


There are several options for heating and we normally allow our clients to chose the one they prefer. For the environmental heating, the traditional air conditioning with a fan coil unit is the simplest and least expensive option. There’s also radiant floor as a slightly more expensive option. As for water heating, we normally recommend either a generator or an electric boiler connecter to solar panels. 


MIMA ReStart has a double inclination roof, of 3% to each side and the house is optimized with gutters that flow the water directly to the floor.


Three different foundation types can be used in a MIMA ReStart, depending on the land qualities. The most popular versions are either a simple concrete base or local concrete supports. A wooden foundation structure is preferred when the land is protected and does not allow for a big intervention.


Amongst all structural materials, wood is certainly one of the most flexible building materials: it has one of the best strength/weight ratios when compared to others. MIMA’s structural solution uses Glulam® structures, light yet very resistant (micro-laminated wood made of the assembly of thin sheets of Nordic Pine) give MIMA Essential an excellent stability and a great seismic behaviour.  The current project suits areas with average seismic activity. However, for areas with extreme seismic influence, the project must be reviewed by our engineers.


he molecular structure of wood makes it very resistant to high temperatures, as it neither melts nor splits. Carbonized wood acts as a barrier that does not allow gases and heat to pass through, making it difficult for fire to spread out and allowing a longer evacuation time.


MIMA unit is normally quite straight forward to assemble as the full system has been planned for an easy construction. MIMA pieces are repeated very often within the unit and therefore the time waste gets reduced. Normally a team of 4 to 5 men is necessary for building the house within the estimated time.


MIMA ReStart project has been developed to meet all legal requirements. The approval process guarantees certification at an European level. MIMA Essential is delivered with a complete folder of drawings that may be necessary for licensing procedures (architecture and engineering), fact sheets and guarantees of all components.


• The customization of the house project, designed by MIMA architects;

• Architectural design project and all specialties;

• The house construction (with all the specifications described in the catalogues);

• A warranty of 5 years in case of construction issues;

• Electrical installation (outlets, plug-ins and downlights with eco leds);

• All sewerage and water installations, ready to be connected on site;

• Transportation in Portugal and on site assembly;

• House permit;

• Maintenance plan.


• The site survey;

• Foundations;

• Appliances;

• Thermal control equipment;

• VAT taxes.