Simplicity
of the process

Identity

Although all houses have their own identity, all being different from one another, they all have a recognizable common basis inherent in the Mima system. This is our ultimate goal: to allow for a customization with respect to predefined architectural rules.

Quality

The quality of the architecture, along with the quality of the construction execution and construction materials is Mima’s fundamental aim. We want to do good architectural buildings and buildings that last and age gracefully.

Simplicity

Simple buildings are the most beautiful and timeless ones. We do not intend to do different or strange, we intend to do timeless, beautiful and comfortable buildings. We believe that simplicity is the ultimate sophistication.

PROCESS

PRICE
AND PAYMENTS

PHASE 01

Concept
Design Study

1%

1% for projects abroad.
Conceptual development of the project. Plans (per floor), 1:100, with solid, dimensioned plots, with total areas and division areas.
Set of vectorial 3D's synthesis. Simplified budget estimate (for fee calculation)

PHASE 02

Permitting
Architecture

3%

While the project is being verified at the City Hall, finishes and details are defined and designed to integrate the execution project.

PHASE 03

Permitting
Engineering

3%

After the approval of the architectural project, the engineering projects of the different specialities are submitted to allow obtaining the construction permit.

PHASE 04

Construction
Drawings

3%

While the project is being verified at the City Hall, finishes and details are defined and designed to integrate the execution project.

PROCESS

Price
and Payments

PHASE 01

Concept
Design Study

1%

1% for projects abroad.
Conceptual development of the project. Plans (per floor), 1:100, with solid, dimensioned plots, with total areas and division areas.
Set of vectorial 3D's synthesis. Simplified budget estimate (for fee calculation)

PHASE 02

Permitting
Architecture

3%

What the project is being verified at the City Hall, finishes and details are defined and designed to integrate the execution project.

PHASE 03

Permitting
Engineer

3%

After the approval of the architectural project, the engineering projects of the different specialities are submitted to allow obtaining the construction permit.

PHASE 04

Construction
Drawings

3%

What the project is being verified at the City Hall, finishes and details are defined and designed to integrate the execution project.

MIMA HOUSING

Construction
Network

We are opening offers to all different contractors willing to build a project by Mimahousing. Since we provide a precise set of drawings for the execution project, it will be possible for any contractor to come up with a price offer. The client will always have the final decision regarding the choice of the contractor.